Solar installation process
SPI solar service enquiries can cover site assessment, system planning and installation. The final scope depends on the site, energy use, utility requirements and selected equipment.
- System components may include solar modules, inverter, racking, DC/AC wiring, optional battery storage and monitoring.
- Maintenance commonly includes periodic cleaning and checking system output; follow the component manufacturer's instructions.
- The supplied notes cite a 25–30 year typical solar-module life; warranties vary by manufacturer and product.
- Solar installation cost is project-specific and may be quoted per watt after site and scope review. Incentives and net-metering rules depend on local policy and utility approval.
- 1Assess roof or ground conditions, orientation, shading and available solar exposure.
- 2Review electricity bills and energy consumption; a south-facing orientation is often favorable in the northern hemisphere, but shading and site layout determine the final array direction.
- 3Decide whether the project is grid-tied, off-grid or hybrid.
- 4Design the system around the selected panels, inverter, mounting, cabling, protection, optional batteries and monitoring.
- 5Coordinate applicable permissions, utility approvals and grid-connection requirements.
- 6Install mounting, panels, inverter, wiring and specified earthing/lightning-protection components.
- 7Complete inspection, testing, commissioning and handover according to the agreed project scope.
SPI's exact service scope, equipment supply, approvals, cost and warranties must be confirmed in a project quotation. No generation or savings estimate is guaranteed without a site-specific assessment.